Project Details

Two-Phase, Two-Floor Project: Demolish existing offices and labs and replace 75% of existing duct system and raise entire sprinkler system to accommodate higher ceilings. Construct Cisco standard offices, open furniture areas, 4000 SF IOS lab 4000 SF, two bench labs and a 3000 SF data center with UPS and emergency generator back-up. The first 80,000 SF was turned over in 10 weeks; the remaining 25,000 SF including the Data Center was completed four weeks later.

2nd Floor Demolish existing offices, open furniture areas, two bench labs and an IOS (14,000 SF) raised floor rack lab supported by 120-ton dry cooler system and two new electric rooms each with a 225 KVA transformer.